Projects at Seven Ocean
VIBRATION ANALYSIS ON M/E @ ANCHORAGE
- Vibration Analysis
- Vibration Analysis
FABRICATION OF ANCHOR WINCH DRUM
- Anchor Winch Drum
- Anchor Winch Drum-1
FABRICATION OF EXPANSION BELLOW
- FABRICATION OF EXPANSION BELLOW
- FABRICATION OF EXPANSION BELLOW
FABRICATION OF REDUCER & PRESSURE TESTING @ 300 BAR
- FABRICATION OF REDUCER & PRESSURE TESTING
- FABRICATION OF REDUCER & PRESSURE TESTING
- FABRICATION OF REDUCER & PRESSURE TESTING
INSULATION JOBS CARRIED OUT @ ANCHORAGE
- insulation-1
- insulation-2
- insulation-3
- insulation-4
COOLER RE-TUBING DONE & PRESSURE TESTED SUCCESSFULLY
- Anchor Winch Drum
- Anchor Winch Drum
- Anchor Winch Drum
- Anchor Winch Drum
PHE SERVICED( 80 PLATES), PRESSURE TESTED & BOXED BACK @ ANCHORAGE
REPAIR OF FOREPEAK TANK
Ship Side Steel Plate Renewal job @ Singapore OPL.
- shell plate renewal
- shell plate renewal
- shell plate renewal
- shell plate renewal
GRAB- MAJOR STEEL WORK @ ANCHORAGE
- grab-4
- grab-1
- grab-3
- grab-2
TANK CLEANING & MANPOWER SUPPLY
- tank cleaning
- tank cleaning
MAK PISTON CROWN- INSPECTION & RECONDITIONING @ WORKSHOP
- piston crown inspection
DECK CRANE LOAD TEST
- deck crane load test
- deck crane load test
- deck crane load test
MFG & SUPPLY OF PILOT/EMBARAKATION LADDER – MED APPROVED
- ladde
- Embarkation ladder
OUR ELECTRIC MOTOR WORKSHOP
- motors




































